Jbz-S Series Double-Side PE Coated Paper Cup Making Machine

    • Model NO.: JBZ-S
    • Cup Size(Ounce): 4-22 Oz
    • Required Paper: Signle and Double Side PE Coated Paper
    • Logo Printing: Without Logo Printing
    • Customized: Customized
    • Specification of Paper Cup: 4-22oz
    • Outer Diameter of Cup Bottom: 35-70
    • Trademark: changs
    • Origin: Zhejiang, China
    • Applicable Objects: Food,Beverage,Yogurt
    • Speed: 80-100pcs/min
    • Automation: Automatic
    • Certification: CE
    • Condition: New
    • Outer Diameter of Cup Rabbet: 50-95
    • Cup Height: 50-175
    • Specification: CE
    • HS Code: 844130900
    Paper Cup Forming Machine
    Jbz-S Series Double-Side PE Coated Paper Cup Making Machine
    JBZ-S Paper Cup Forming Machine is an automatic machine with multi-working station.
    It produces two-side film-coated paper cup through the procedure of automatic paper feeding, ultrasonicwelding, oil silicon lubrication, bottom punching, heating, knurling, curling and cup discharge.
    The sealing system is ultrasonic sealer, so this model is suitable for making two side PE coated paper with full printing design cups. This cup can for both hot and cold drinking, such as soft drinking, ice-cream and coffee etc.

    Cup forming process:
    Jbz-S Series Double-Side PE Coated Paper Cup Making Machine


    Technical parameter:
    Model JBZ-S12 JBZ-S22 JBZ-S36
    Cup size 6, 8, 12 oz 16, 22 oz 36 oz
    Raw material Single and double side PE coated paper
    Capacity 40-50 pcs/min. 35-45 pcs/min. 30-35 pcs/min.
    Voltage 380V/50HZ( it can be changed if customer require)
    Total power                                          6.5kw
    Weight 1600Kg 1700Kg 1800Kg
    Pack size
    (LxWxH)
    2800x1350x1760mm
    730x600x1100mm
    2800x1350x1850mm
    730x600x1100mm
    2800x1350x2000mm
    730x600x1100mm


    Sample:
    Jbz-S Series Double-Side PE Coated Paper Cup Making Machine


    Our Service:

    1. Warranty

                  1 year limited warranty after installation.If the spare parts is broken in the warranty

                  period , we will send a free replacement parts to you . 

    2. Installation and Training

                  We can send 1-2 engineers to buyers factory to install and set up the machines and

                  training, but all the charges for the engineers should be paid by buyer.

    3. Quotation

                 The quotation is available in 60 days

    Condensing Units

    Condensing Units,Condenser Coil,Ac Condenser Unit,Outdoor Ac Unit

    Hangzhou Refworld Mechanic&Electric Co.,Ltd , https://www.refworldrefrigeration.com

    Previous Post: 2009 China Shiyan Automobile Auto Parts Ordering Conference opens on October 18
    Next Post: Gas Sensor Enterprise Hanwei Electronics GEM First Listed
    Home
    Recent Posts
    • Passenger car fuel consumption limit is expected…
    • Hangzhou: The maximum subsidy for purchasing ele…
    • Jiayuguan Builds the World's First Photovolt…
    • Test chamber
    • Stainless steel pump will become the pioneer in …
    • China's first automatic optical inspection e…
    • Rongsheng took over the entire Quanchai Diesel p…
    • Automatic Conveyor Scale for Checking Over Wiegh…
    • Kia Motors' global market share is expected …
    • Dongfeng Industrial Company Signs Strategic Agre…
    • Airport Super Body Scanner Security Weapon Detec…
    • Power battery recycling is still in progress
    • Anti-Monopoly's Reflection on China's Au…
    • Eaton China Wins Outstanding Corporate Social Re…
    • Yutong Heavy Industry New Products Successfully …
    • Domestic Chemical Enterprises Should Use "R…
    • The origin of the sports car
    • Fukuda February sales of 49,100 units increased …
    • Weichai Power became the first national innovati…
    • April BMW sales increase 18% worldwide China sur…