Plastic Glue Bottle Cap and Plug Mold

    • Model NO.: YS20170218999
    • Surface Finish Process: Polishing
    • Plastic Material: PP, PC, PS, PE, PU, PVC, ABS. PMMA, etc.
    • Application: Household Appliances
    • Design Software: Ug. Proe, CAD. Caxa etc.
    • Standard: HASCO
    • Product Material: Steel
    • Cavity: Single/Multi
    • Mould Life: 3,000,000 Shots
    • Trademark: YS
    • Specification: To meet customer needs
    • HS Code: 8480719090
    • Shaping Mode: Injection Mould
    • Mould Cavity: Multi Cavity
    • Process Combination Type: Progressive Die
    • Runner: Hot/Cold
    • Installation: Fixed
    • Customized: Customized
    • Mould Base: Lkm, Hasco.etc.
    • Surface: as Per Request
    • Delivery: by Sea or Air
    • Transport Package: Wooden Case
    • Origin: China, Zhjiang, Taizhou
    1.ADVANTAGE:
    1.Saving 10%-30% cost than others.
    2. Direct factory price
    3. Life:3, 000, 000 time
    4.2D and 3D provided
    5. Quick T1  time: 25-40 days

    6.More than 15 years experience
     
    2.PICTURE:
     Plastic Glue Bottle Cap and Plug Mold
    Plastic Glue Bottle Cap and Plug Mold
    Plastic Glue Bottle Cap and Plug Mold
    Plastic Glue Bottle Cap and Plug Mold
    Plastic Glue Bottle Cap and Plug Mold
    3.MOULD  DESCRIPTION:
    1.Cavity:1-72
    2.Mould base material :P20 , 45# , 4CR13 , .ECT
    3.Core&Cavity material : S136,718, P20,2378,2316,4CR13,P20 .ECT
    4.Runner: Cold /Hot (LOCAL BRAND,HASCO,YUDO,HUSKY .ETC)
    5.Life time:3,000,000 shots
    6.Quick T1 time:25-40 days
    7.Package:wooden case
     
    4.MOULD  MANUFACTURE  PROCESS:
    Cap Mould : grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install
     
    Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→polish→electroplate→install
    Need vale ,itself-locking :new advanced needle vale gate system.each cavity is self-lock independently to ensure low decent ration of product.
    The excellent hot runner design assures uniform heating and greatlyimproves the quality of plastic products
     
    5.AFTER  SALE  SERVICE:
    Any mould problem,we will provide free maintenance service
     
     
    6. FLOW CHART
     
    1 Sample or 2D,3D drawing from customer
    2 Bulid 2D,3D drawing
    3 CAD mould design
    4 Send drawing to customer to confirm
    5 Parts inspection/CNC machining/EDN machining
    6 Mould assembly
    7 Mould test
    8 Send sample to confiom
    9 Dilver the mould
     
    Plastic Glue Bottle Cap and Plug Mold


     

    Mist Bottle

    Mist Bottle

    Berlin Packaging (Qingdao) Co.,Ltd , https://www.berlinpacksupplier.com

    Previous Post: Huachen Huatong independently developed 3 new products and obtained 3C certification
    Next Post: Qty 10-15 Automatic and Hydraulic Concrete Block Machine/Cement Brick Machine/Hollow Brick Machine/Interlock Block Machine
    Home
    Recent Posts
    • Passenger car fuel consumption limit is expected…
    • Hangzhou: The maximum subsidy for purchasing ele…
    • Jiayuguan Builds the World's First Photovolt…
    • Test chamber
    • Stainless steel pump will become the pioneer in …
    • China's first automatic optical inspection e…
    • Rongsheng took over the entire Quanchai Diesel p…
    • Automatic Conveyor Scale for Checking Over Wiegh…
    • Kia Motors' global market share is expected …
    • Dongfeng Industrial Company Signs Strategic Agre…
    • Airport Super Body Scanner Security Weapon Detec…
    • Power battery recycling is still in progress
    • Anti-Monopoly's Reflection on China's Au…
    • Eaton China Wins Outstanding Corporate Social Re…
    • Yutong Heavy Industry New Products Successfully …
    • Domestic Chemical Enterprises Should Use "R…
    • The origin of the sports car
    • Fukuda February sales of 49,100 units increased …
    • Weichai Power became the first national innovati…
    • April BMW sales increase 18% worldwide China sur…