LS-500 tensile testing machine operating procedures

    1 Preparation

    1.1Before starting the machine, it is necessary to check whether there is any strength defect in the force receiving parts, whether the connecting parts are tight and whether the test pieces are connected reliably.

    1.2 Turn on the power debugging equipment.

    1.2.1 Before starting the oil pump, adjust the instrument to work, check whether the connection between the computer host, monitor, printer, and sensor is correct and reliable, click "Load", "Pause", "Uninstall", and then click the mouse. "Reset", check the electrical actuators to ensure that the equipment is operating properly.

    1.1.2 Turn on the oil pump and run it for 3 to 5 minutes without load.

    2 tests:

    2.1 Electric preloading, pre-tightening until the load value starts to show, the specimen with large deformation can be preloaded to 20% of the test value.

    2.2 Start the computer text system, print test units, commission test units, test code, test name and specifications, set the load according to need, set the pressure holding time.

    2.3 The computer zeros, loads, and then divides two situations:

    2.3.1 According to the setting procedure, the computer automatically controls and completes all the test procedures of setting value shutdown, pressure keeping, and unloading.

    2.3.2 Suspend, uninstall and reset as required.

    2.4 printing

    2.4.1 The test load value, the maximum value, and the load curve can be printed at any time. The load curve of the peak value and the whole process can also be printed after unloading.

    2.5 Notes:

    2.5.1 When the tester is working, all moving parts should be flexible.

    2.5.2 If it is found during the test that the instrument is continuously loaded and the displayed value of the instrument does not increase or increase very little, the plastic deformation of the tested part occurs, and the load must be stopped immediately for inspection.

    2.5.3 Loading, suspending, and unloading of the tester must be performed on the computer with a click of the mouse. Preloading and release must be performed in the unloaded state.

    2.5.4 The console must be reliably grounded.

    2.6 Shutdown: Shutdown must first shut down the computer and then turn off the power.

    Flat Steel Bar

    We can supply both hot rolled or cold drawn flat steel bars. Cold drawn flat steel bars are usually produced by cold drawing through flat shape mould from hot rolled flat steel bars. Some flat steel bars width and thickness are very near like square bar. We may produce by hot rolled steel round bar, too. Our factory has complete and advanced production and inspection, testing facilities, we can control flat steel bar hardness for you, too.

    Flat Steel Bar,Carbon Flat Steel Bar,Mild Steel Flat Bar,Cold Drawn Steel Flat Bar,A36 cold drawn steel bar

    SHANDONG LE REN SPECIAL STEEL CO., LTD. , https://www.sdhighstrengthsteelbolts.com

    Previous Post: Centerless Grinding Machine Safety Technical Code of Practice
    Next Post: None
    Home
    Recent Posts
    • Introduction to forest fire prevention wireless …
    • Introduction to the beneficiation method of vana…
    • Wellhead signal worker safety technical operatio…
    • Shandong Yangyang Middle School New Campus Proje…
    • International crude oil turmoil domestic oil pri…
    • Web posting staff apologized due to flight delay…
    • 5,000 women will be affiliated with billionaires…
    • Car to the countryside: it looks beautiful
    • Cast steel grinder grinding ball imports gradual…
    • Johnson Controls Romania's new seat factory …
    • Air Filter Element Fittings Cm6180
    • Analysis of Common Problems in Application of El…
    • Everyone says it's good and you can't go…
    • What is the length of the "double-point&quo…
    • Explosion-proof junction box, explosion-proof di…
    • What should I do if the tablets come off?
    • Production mine dust prevention measures
    • Wuhan LED board aging test bench design points
    • Prevention measures for landslides in dump pits …
    • Main measures for prevention and control of mine…