Copper Fittings Fastener Copper Tube Fitting

    Model NO.: 112AN06AB
    Color: Copper
    Service: 24 Hours Online
    Warranty Period: 12 Months
    MOQ: Negotiable
    Package: Carton
    OEM: Accepted
    Sample: Ok
    Usage: Refrigeration Industry
    Delivery Time: According to The Quantity
    Trademark: Andwin
    Transport Package: Standard Carton
    Specification: Brass
    Origin: Jiangsu, China
    HS Code: 7418200000
    Copper Fittings fastener Copper Tube Fitting
    Copper Fittings Fastener Copper Tube Fitting
    TEE C X C X C is used for copper tube/pipe connecting.

    1. Material:  Red Copper / Brass
    2. Type: as below, can be customized.
    Part No. Part # Actual Size (OD) Normal Size Part No Size (mm)
    112AN06AB W 40306 1/4 14/8 112EN06AB 6
    112AN08AB W 40313 5/16 3/16 112EN08AB 8
    112AN10AB W 4000 3/8 1/4 112EN10AB 10
    112AN13AB W 4001 1/2 3/8 112EN12AB 12
    112AN16AB W 4006 5/8 1/2 112EN14AB 14
    112AN19AB W 4017 3/4 5/8 112EN15AB 15
    112AN22AB W 4031 7/8 3/4 112EN16AB 16
    112AN28AB W 4048 11/8 1 112EN18AB 18
    112AN35AB W 4068 13/8 11/4 112EN22AB 22
    112AN42AB W 4084 15/8 11/2 112EN28AB 28
    112AN54AB W 40102 21/8 2 112EN35AB 35
    112AN67AB W 40123 25/8 21/2 112EN42AB 42
    112AN80AB W 40152 31/8 3 112EN54AB 54
    112AN92AB W 40190 35/8 31/2 112EN64AB 64
    112AN105AB W 40200 41/8 4 112EN67AB 67
    112AN130AB W 40400 51/8 5 112EN76AB 76
    112AN156AB W 40500 61/8 6 112EN80AB 80
    112AN206AB W 40525 81/8 8 112EN89AB 89
            112EN108AB 108
    Other Related Products

    Copper Fittings Fastener Copper Tube Fitting


    Packing 
    Copper Fittings Fastener Copper Tube Fitting

    shipment:
    Copper Fittings Fastener Copper Tube Fitting


    our product:
    Copper Fittings Fastener Copper Tube Fitting


    Advanced One-Stop Purchasing Service. Welcome !
     
    Contact:
    Aimee Chen
    Changzhou Andwin International Corporation Limited
    Add:No.91 Hanjiang Road, New District, Changzhou, Jiangsu, China.
     
    Phone: 0086 18015803382
    Tel: 0086-519-83984950-803
    Fax: 0086-519-83984950-808
      
      
      
               
     
     

    Metal Assembly

    Metal assembly refers to the process of joining two or more metal components to create a single, functional unit. This process can be accomplished through a variety of methods, including welding, brazing, soldering, and mechanical fastening.

    Welding involves melting the metal components at the joint and fusing them together. This can be done using various heat sources, including gas flames, electric arcs, and lasers. Welding is commonly used in the construction of buildings, bridges, and other large structures.

    Brazing and soldering are similar processes that involve melting a filler material to join the metal components. Brazing uses a high-temperature filler material, while soldering uses a lower-temperature material. These processes are often used in the manufacture of electronics and plumbing components.

    Mechanical fastening involves using bolts, screws, or other fasteners to hold the metal components together. This method is commonly used in the assembly of machinery and vehicles.

    Metal assembly is a critical process in many industries, including manufacturing, construction, and transportation. It requires skilled technicians and specialized equipment to ensure that the components are joined correctly and that the final product meets the required specifications.

    Metal Assembly,Zinc Electroplating Metal Plate,Nickel Plated Metal Plate,Perforated Plate Stamping

    Suzhou Gold ant Precision Sheet Metal Co.,Ltd , https://www.jmywelding.com

    Previous Post: Boarding bridge
    Next Post: China-Lutong has Successfully Completed the AUTOMEC 2017
    Home
    Recent Posts
    • In 2017, the rural subsidies have been adjusted.…
    • What happened to these wonderful car accident sc…
    • PVC Coated and Galvanized Fully-Automatic Chain …
    • Shanhe Intelligent New Concept Loader SWEL won I…
    • Td05-12b Compressor Wheel Factory Supplier Thail…
    • From January to April, the three major economic …
    • Shanghai Putian Industrial Base Phase A1 Expansi…
    • 1200kg/Day Commercial Flake Ice Machine with Aut…