Common Faults in Universal Testing Machine Operation and Solutions

    In the long-term operation of the universal testing machine, a series of problems will arise due to the aging of the parts or improper maintenance . Here we will summarize some possible failures and solutions for the users who are using or are ready to purchase. Provide some help:

    Failure analysis:

    The host does not start Check if the power cord is connected Check that the power cord is connected correctly and securely.

    Whether the three-phase 380 power supply is lack of phase Check if the power socket is missing phase, and if the power line is off.

    The emergency stop button is pressed to lift the emergency stop button

    The limit switch turns on the adjustment limit button so that it is off.

    Whether the sensor is hit by the initial force when starting the machine, and whether the sensor has obvious deformation? If so, the sensor is bad

    Zero adjustment parameters have been changed to open the zero adjustment program for hardware zero adjustment

    Whether there is any welding or disconnection of solder joints

    The force value beats near a certain point and there is no response. Jig slipper to select the right fixture

    At the beginning of the curve, there was a section of the platform specimen that was not tightened and the load start recording value was set too small. Set the value to a larger value and filter out the platform section.

    Solution:

    1) The switching power supply is working properly. Measure the voltage at each output point of the switching power supply

    2) The host starts but does not operate. Check whether the sensor connector is connected and whether there is a force value display. Connect the sensor connector and reconnect the sensor connector.

    3) Whether the communication line between the computer and the host computer is in poor contact with the center of gravity of the communication line

    4) Panasonic servo system has no error message If Error is displayed, the servo system error, restart the host

    5) The force parameter is not accurate. The initialization parameter of the force sensor is called. Correctly recall the initialization parameter that is consistent with the sensor.

    6) The force calibration parameter has been modified to recalibrate the force value

    7) The computer displays "overload" or the force value cannot be zeroed. The sensor connector is fully connected. Reinserted sensor

    8) The force parameter has been modified to recalibrate the force value.

    These are commonly asked solutions. If you encounter problems that cannot be solved during the operation, you can contact us. We will arrange professional technicians to answer your questions.

    Railcar Body Inner Structural Parts

    These parts are mainly installed inside the car body, mostly small parts, such as tie rods, wire pipes, etc., which are installed inside the car body without risk of rain, so there is no need for spraying, and spraying or coating can also be done according to customer needs.

    Jilin Zexin Industrial Development Co., Ltd. was founded in 2001 with a registered capital of 5 million RMB and is a high-tech enterprise in Jilin Province. There are about 100 employees, and the company's sales volume reached 20 million RMB in 2022. The company has more than 30 sets of various equipment including 2 NC laser cutting machines, 6 NC machining centers, 8 welding machines for different purposes, NC cutting machines, NC bending machines and others. After more than 20 years of construction and development, it has formed a comprehensive enterprise of electrical system, carbon steel, stainless steel and aluminum alloy stamping, welding, machining and surface coating. The company has passed the ISO9001:2015 quality management system certification, EN15085 CL1 welding system certification, American standard AWS welding certification, and ISO/TS22163:2017 quality management system certification. It is a high-quality supplier cooperated by CRRC Changchun Railway Vehicles Co., Ltd., the core manufacturer of China's urban rail transit equipment and high-speed train.

    Railcar Body Inner Structural Parts,Carbody Structural Parts,Cable Wire Running Rod,Wire Bond Termination Bar

    Jilin Zexin Industry Development CO., LTD. , https://www.jilinzexin.com

    Previous Post: Lime Kiln Suppliers/Active Lime Production Line/Rotary Lime Kiln
    Next Post: The use of CNC cutting machine
    Home
    Recent Posts
    • Vacuum pump exhaust valve repair steps
    • International Packaging Machine Market Developme…
    • Do you understand the sensor of your wearable de…
    • What is the scope of use of the ETC electronic t…
    • Valve procurement on the technical requirements …
    • · "Anti-monopoly" sword refers to the…
    • Topp Yun Yun soil moisture detection system 7 ma…
    • Design of cycloidal pinwheel reducer based on So…
    • Metal laser melting technology will play an impo…
    • Our scholars have developed high-performance man…
    • Eight major impacts of supply-side reform on the…
    • What is a tackle? Pulley is divided into several…
    • Video intercom advantages
    • Measuring the influence of media on the flowmete…
    • Consolidate and increase grain production capaci…
    • U.S. Breakthrough (TOP1) Four Major Advantages o…
    • Metal Button Tool Laser Marking Machine with Ce
    • Tianjin Increases Inspection of Highly Toxic Pes…
    • · LeTV will cooperate with Coolpad to build 5G …
    • Tongri/ Wholesale/ Lubrication/ Angular Contact …